Home (CZ) | PL | SK | DE | EN | RU
Video
Reference
We are very satisfied with the result. The design is already showing that short, efficient assembly time will be absolutely feasible. We ascertained these results not just in theory but very vividly with a 3P (Production Preparation Process) workshop. The design’s good momentum will also flow into a follow-up project.
Elmar Stichlmair, Consultant Engineering Assembly Civil Programmes, MTU Aero Engines

Připravovaná školení

Připravujeme pro Vás nová školení LEAN na téma "KATA" a "OD SUPERMARKETU AŽ K ONE PIECE FLOW (Simulace řídících systémů výroby)"