Home (CZ) | PL | SK | DE | EN | RU
Video
Reference
During the project, the plant was running at close to maximum capacity, meaning that everyone involved was under great stress. Nevertheless, through close collaboration and tight project management, we were able to achieve the ambitious objectives.
Joachim Metzmacher, Business Unit Head Heavy Equipment Production, ENGEL AUSTRIA GmbH

Připravovaná školení

Připravujeme pro Vás nová školení LEAN na téma "KATA" a "OD SUPERMARKETU AŽ K ONE PIECE FLOW (Simulace řídících systémů výroby)"