Home (CZ) | PL | SK | DE | EN | RU
Video
Reference
We are very satisfied with the result. The design is already showing that short, efficient assembly time will be absolutely feasible. We ascertained these results not just in theory but very vividly with a 3P (Production Preparation Process) workshop. The design’s good momentum will also flow into a follow-up project.
Elmar Stichlmair, Consultant Engineering Assembly Civil Programmes, MTU Aero Engines

LEAN Prague Autumn 2016

                            Registrace ZDE                                                                      Registration HERE

                            Registrace ZDE                                                                       Registration HERE